Zaliznychna 7
The project involves converting the utility buildings of the former “Avtonavantazhuvach” (Forklift) factory — a site with a long history — into a multifunctional complex featuring a student hub and retail spaces.
The second phase of the project involves constructing a new public building on the undeveloped part of the site, which has real potential to become a public “hub,” as it sits at the intersection of pedestrian flows connecting the district with the Main Railway Station and the large-scale public space of Dvirtseva Square.
- Location: Lviv, Zaliznychna Street, 7
- Type of construction: Reconstruction, new construction
- Status: Design, obtaining building permit
- Year: 2019
- Team: Serhii Todoriv, Markiian Maksymiuk, Solomiia Halaiko
- Site area: 7,010 m²
- Total area before reconstruction: 10,320 m²
- Total area after reconstruction: 15,170 m²
- FAR: 2.4
- Location: Lviv, Zaliznychna Street, 7
- Type of construction: Reconstruction, new construction
- Status: Design, obtaining building permit
- Year: 2019
- Team: Serhii Todoriv, Markiian Maksymiuk, Solomiia Halaiko
- Site area: 7,010 m²
- Total area before reconstruction: 10,320 m²
- Total area after reconstruction: 15,170 m²
- FAR: 2.4